Result for 1 item(s)

Aiding The Decision-Making Process in Progressive Pigging Activities for Waxy and Sandy Oil Pipelines Through Flow Assurance Simulation

Proceedings Title : Proc. Indon. Petrol. Assoc., 49th Ann. Conv., 2025

The 6” MOL A to B pipeline was built in 2013. The characteristics of the fluid flowing through this pipeline contain sand and wax. Throughout it...

Read More

Log In as an IPA Member to Download Publication for Free.