Result for 2 item(s)

Resin Job for Rectification of the Micro Channeling Leakage on the Cement Plug Barrier

Proceedings Title : Proc. Indon. Petrol. Assoc., 48th Ann. Conv., 2024

The ASAP-1X exploration well was drilled in 2011 and the BEDIDI DEEP-1X exploration well was drilled in 2015. During its journey, it was monitored for...

Read More

Log In as an IPA Member to Download Publication for Free.

Remedial Multi-Stage Cement Plugging in Loss Zones

Proceedings Title : Proc. Indon. Petrol. Assoc., 49th Ann. Conv., 2025

An idle well located in Offshore Natuna Field, Indonesia, is proposed to serve as a “mother well” for sidetrack drilling. The well complet...

Read More

Log In as an IPA Member to Download Publication for Free.