Result for 115 item(s)

Annulus Cementing with Coil Tubing Packer Methods with Case Study on Sisi Nubi Field

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

PHM fields are located in The Mahakam Delta and Offshore area in East Kalimantan, Indonesia. Most of the wells are multizone gas producers completed w...

Read More

Log In as an IPA Member to Download Publication for Free.

Multi Zone Single Trip Gravel Pack System Deployed on Hydraulic Workover Unit: Holistic Approach to Optimize Drilling and Completion Cost in the Mahakam Delta

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

The Multi Zone Single Trip Gravel Pack (MZSTGP) system has been proven as the main solution for developing shallow reservoirs and overcoming sand prod...

Read More

Log In as an IPA Member to Download Publication for Free.

Successful Geological Strategy for Setting Intermediate Casing Prior Approaching Kujung Carbonate in Jambaran Field, Cepu Block

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Jambaran Field was discovered in 2001 by J-1ST1 exploration well. The discovery well encountered steep-flanked carbonate build-up structure (Kujung Fm...

Read More

Log In as an IPA Member to Download Publication for Free.

Breakthrough on Routine Service Cycle Time Improvement – Leap Frog Concept, Duri Field, Indonesia

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Leap frog concept was created to address the loss of single joint rig agility and drive the cycle time average lower than ever. The idea is to move th...

Read More

Log In as an IPA Member to Download Publication for Free.

Pressure Activated Sealant to Restore Tubing Integrity – Case Study of Well Tn-X in Mahakam

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Pressure activated sealant is used to repair tubing leak and restore tubing integrity without the need to install downhole devices which yield additio...

Read More

Log In as an IPA Member to Download Publication for Free.

Unlocking Oil Resources without Artificial Lift Using Testing Barge in Tambora Gas Field

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Tambora field is a mature gas field located in a swamp area of Mahakam delta without artificial lift. The main objective of this project is to unlock...

Read More

Log In as an IPA Member to Download Publication for Free.

Surface Casing Perforation, A Promising and Reliable Solution for Producing Marginal Reserves of Shallow Reservoir Layer in Shallow Gas Prone Tunu Field

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

In these difficult economic conditions, oil companies might accept higher challenges and risks to grasp only marginal gains. A new frontier in product...

Read More

Log In as an IPA Member to Download Publication for Free.

An Innovative Well Intervention for Production Optimization in Depleted Gas Reservoirs Thru Coil Tubing

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Coil Tubing operated in NL wells, South Sumatera because of depleted reservoir pressure. Objective of coiled tubing operation are sand clean-out and a...

Read More

Log In as an IPA Member to Download Publication for Free.

Quadrant Mapping Artificial Lift Concept

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

This paper outlines a concept for monitoring performance of artificial lift performance such as electrical submersible pump (ESP), hydraulic pumping u...

Read More

Log In as an IPA Member to Download Publication for Free.

Bottom Hole Assembly Design Enhancement Successfully Eliminate Hole Problems and Reduce Significant Drilling Time : South S Field Case Study

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

For S-15 and S-14 wells at South S Field, drilling of the 12-1/4” hole section became the longest tangent hole section interval of both wells. There...

Read More

Log In as an IPA Member to Download Publication for Free.

Digitalization in Offloading for Mature Well Revival Optimization: Case Study of Peciko Gas Field

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Liquid loading is a common issue in the production of mature gas wells in lower pressure reservoirs that have gone below dew point pressure or have ac...

Read More

Log In as an IPA Member to Download Publication for Free.

Comprehensive Surface Facilities Debottlenecking Strategy to Maximize Delivery Potential in South Mahakam – Pertamina Hulu Mahakam

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

South Mahakam (SMK) surface facilities were designed and built at a capacity of 250 MMscfd as defined in Plan of Development. Development sequences we...

Read More

Log In as an IPA Member to Download Publication for Free.

Integrated Optimization of SIMOPS (Drilling, Well Intervention, and Production) on Jackup Rig : a Case Study of Under Cantilever Operations at X-1 Platform in Mahakam Asset

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Deliverability of a field shall be reflected through its hydrocarbon production. In offshore fields, the backbone for stability of production comes fr...

Read More

Log In as an IPA Member to Download Publication for Free.

Seven Pillars in Cost Effectiveness for Sustaining the Life of Mature Fields: an Example from Mahakam Block

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Maintaining mature fields provides major challenges in which production and resources are decreasing, while the operations complexity is increasing. T...

Read More

Log In as an IPA Member to Download Publication for Free.

Cost Effective Permanent Well Plug & Abandon on Cluster-X With Complex Well Conditions

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Regulation PTK-040 SKK MIGAS explained that the oil company must permanently close the wells post-production operations. Cluster-X has complex well co...

Read More

Log In as an IPA Member to Download Publication for Free.

Corrosion Modelling of Gas Wells With Excessive Sand Production: Case Study of Field Y in Indonesia

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

This publication addresses risk analysis and the potential of sand induced tubing erosion in gas production wells due to high rate gas wells combined...

Read More

Log In as an IPA Member to Download Publication for Free.

Fuzzy Logic and Digital Concept for Estimation of Oil and Gas Development

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Accurate cost estimating is required to improve decision making based on project economic evaluations. The process of cost estimation largely depends...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Application of Bit With Adjustable Depth of Cut to Mitigate Stick & Slip and Significantly Improve Drilling Performance in Mahakam - First Application in Asia Pacific

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Tunu is a mature giant gas field in Mahakam which is already entering a production declining phase. Most of the wells are targeting marginal reserves...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Improved Primary Cementing Design as Mitigation to Post-Cementing Gas Migration

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Hydrocarbon migration after cementing is a troublesome issue which is usually faced during well construction process. The problem will be more complic...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Risk Analysis Model of Indonesian Deepwater Drilling

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Numerous challenges are encountered in deepwater drilling such as remoteness of location, weather conditions, geological uncertainty, downhole tempera...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Value Integrated Planning for High-Exposure Major Shutdown in Medco E&P Natuna Ltd.

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Medco E&P Natuna Ltd. (Medco E&P Natuna) has developed for its facilities a Planning & Scheduling - Shutdown Guideline. This guideline covers the init...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Double (Full Encirclement) Sleeves Pipe as One of the Best Method of Permanent Repairs Refer to ASME PCC-2 Study Case: Belida (Medco E&P Natuna Ltd) Gas Lift Pipeline Leaks

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Based on ASME PCC-2, one of method of pipe repair that will be considered as locally permanent repair is installation of double sleeve, but not everyo...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Innovative for Global Production Optimization Techniques of Kalimantan Oil Field with Gas Lift Allocation Under Limited Gas Supply Using Equal Slope Method

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Gas lift is one of the most common artificial lift methods in single well or several well in the oilfield. Because of the price to compress the gas an...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Successful Application of Acidizing Scale Removal for Unlocking Reserves and Production Improvement: Case Studies in Peciko

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Peciko is one of the giant gas fields located in Mahakam area, Indonesia. The field has been in production since 1999 and entering into the late stage...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Success Story of The First ESP-Gas Lift Hybrid in South Sumatra Block - IB-00XX Case Study

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Production deferment is something we strive to minimize in our daily operations. With electrical submersible pumps (ESP) quickly becoming the new prim...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

3.4 Days - Evolution of the Fastest Development Wells in Mahakam

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Tunu is a mature giant gas field in Mahakam which already entering production declining phase. Drilling in Mahakam has entered industrialization phase...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Successful Application of Comprehensive BHA Tendencies Analysis and Novel Fit-For-Purpose Real Time Survey Tool for Drilling Exploration Well in South Sumatra

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

CPK-1 and NWR-1 are vertical exploration wells located in South Sumatra, Indonesia, with a total depth (TD) of around 5,000 ft MD. Based on offset wel...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Successful Well Placement in Multilayer Sandstone Achieving Maximum Reservoir Exposure

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

The gas-bearing sandstone reservoir was planned to be drilled laterally. The reservoir was suspected to have not only a lateral compartment but also a...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Successful Comprehensive-Unconventional Solution to Bypass Solid/LCM Plugging in Horizontal Screen Completion

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

The XYZ-01 well drilled horizontally penetrating the oil zone, shale section and ended in water zone. Lost control materials, calcium carbonates, were...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

FSO Cargo Tank Inspection with Drone, a Lesson Learned for Future Implementation

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

FSO Gagak Rimang has fifteen cargo and two slop tanks and each tank needs to be regularly inspected following risk-based inspection (RBI) program to e...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

High Order Polynomic Composition Approach for Early Pump Cavitation Detection to Maximize Heavy Oil Flow Production

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Zulu area and its surface facilities are being operated under a flowing fluid type of heavy oil production with 19 degAPI gravity. This given conditio...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Load Shedding Improvement Study – Handil Field

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Handil is a mature field in Mahakam block which has been operating for more than 40 years. One of the challenges is to maintain the availability and r...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Case Study of P & A Planning in Offshore Wells with Well Integrity Issues Due to Subsidence in ONWJ Area

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Plug and Abandon (P&A) is one of the most important steps of well reconditioning before production phase is halted semi permanently or ceased permanen...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

The Importance of Brownfield Activities for a sustainable Marginal Field Operation

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

With continuous change in subsurface morphology, the fluid characteristics keep changing from the original, intended design requiring modifications to...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Implementation of Saka Drone Solution (Case Study: National Marine Pollution Exercise 2018)

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

During the last decade, development of Commercial Unmanned Aerial Vehicle (UAV) also known as Drone have pushed companies in various industry to re-en...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Root Cause Analysis of Centrifugal Compressor Impeller Failures

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Repetitive impellers failures have occurred in centrifugal compressor driven by gas turbine in 2010 � 2018 operated by Medco E&P Natuna Ltd. The first...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Process Control Improvement to Optimize Banyu Urip Plant Reliability

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Banyu Urip is a sour crude field in Indonesia producing over 220,000 barrels of oil per day, supplying approximately 25% of the national oil productio...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Inspection Measuring Point Optimization on Piping System at PT. Pertamina Hulu Mahakam (PHM)

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Inspection Measuring Point which is commonly known as condition monitoring location (CML) is a designated area on the piping system where periodic exa...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Hammering Tool Application for Shifting Open Formation Isolation Valve Seated in the Hi-angle Subsea Well in Offshore Bali - Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Development drilling campaign was conducted in 2018 at Bali Offshore by Kangean Energy Indonesia (KEI). 3 Horizontal wells and 1 deviated well were dr...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Indonesian Deep-water Petroleum Exploration and Production - Economic and Tehnology Perspective

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Deep-water plays are high-cost ventures, yet they are valid projects. The deposits are larger accumulations and produce at higher rates due to better...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

RSS PowerDrive Orbit : Records in Challenging Mahakam Swamp Directional Well

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Drilling 8-1/2" directional section in main zone wells which are 3500 to 4000-meter true vertical depth (TVD), is proven to be very challenging to mai...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Electrical tubing cutter application in Indonesia saving rig time and increasing efficiency

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

In oil and gas industry, tubing cutting has been traditionally done using explosives. With the increased security and tight control of explosives mate...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Implement maintenance and reliability as operability assurance principles for major project during feed and bidding phase case study: Sumpal compression project

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

Operability Assurance (OA) program is expected to ensure timely and effective Operations involvement in upstream facility projects. OA is a structured...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Operational performance on newbuild drillship at deepwater Makassar Strait, Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

As part of an Indonesia deepwater development project, a newbuild 6th generation deepwater drillship, or “rig,” was awarded a contract in 2013 to fulf...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Heavy oil routine service cycle time improvement

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

In Heavy Oil operations, routine service jobs are important to minimize production decline. With an average of 2000 to 2500 jobs completed in a year,...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Buffer basin cleaning, combination between operation excellence and environmental compliance with 3R (reduce, reuse, recycle) approach

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

In 2012, Total E&P Indonesie (TEPI) decided to conduct cleaning of Buffer Basin. Buffer Basin is an open concrete basin connected to downstream of API...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

The challenge and opportunity HSE lifecycle in oil and gas business in Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

Operatorship of an oil and gas block in Indonesia can be acquired via a Joint Study Agreement followed by operatorship through regular tender, direct...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Emergency response partnership in an area with various industries: a case study of emergency response management

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

EMP Malacca Strait S.A. (EMPMSSA) has been operating Malacca Strait PSC in two main areas: an offshore area at Lalang Strait and an onshore area at Pa...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Banyu Urip oil field development project – socioeconomic issues and challenges

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

Social issues cover the range of impacts (positive and negative) that a project may have on the social environment and vice versa. The social environm...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Shifting the needle towards leading indicators to eliminate serious injuries

Proceedings Title : Proc. Indon. Petrol. Assoc., 39th Ann. Conv., 2015

For years ExxonMobil Indonesia has been delivering world-class lagging indicator safety results. However, lagging indicators are unreliable predictors...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.